Meyer Turku Oy — Erikkila
Although the delivered crane is a light crane, it is impressive. The length of the crane track is 75 m, and the crane span is 7.5 m. Moving the beams out from the production line was realised using a radio-controlled telescopic bridge, which allowed the beams to be loaded to the forklift's reach outside the support frame of the crane.
Get Price